Why an AMC pays for itself - when it is the right kind
Consider a cartoner packing 100 cartons a minute. A broken vacuum generator that takes eight hours to diagnose, source and fit costs 48,000 cartons of output, plus overtime to catch up. The part itself costs a few thousand rupees. Almost every expensive stop we see has the same shape: a cheap part, a slow diagnosis and no spare on the shelf.
A useful AMC attacks all three. Planned visits replace wear parts before they fail, remote support shortens diagnosis from hours to minutes, and the visit report keeps your spares store matched to what the machine actually consumes. An AMC that only offers a discounted call-out rate after a breakdown does none of this.
AMC tiers: three example structures
We offer AMC plans at three levels. The contents below are example structures; each contract is written for the specific machines, shift pattern and location.
| What is included | Basic | Standard | Comprehensive |
|---|---|---|---|
| Preventive maintenance visits per year | 2 | 4 | 4, plus a pre-season or pre-audit check on request |
| Remote support (phone, video, VPN) | Working hours; response next working day | Response within 4 working hours | Response within 2 working hours, extended hours |
| Breakdown visits | Chargeable at AMC rates | 2 per year included | Included (labour) |
| On-site attendance target in India | Best effort | Within 72 hours | Within 48 hours |
| Spare parts | Chargeable | Chargeable, priority dispatch | Agreed wear-part kit included; others chargeable |
| Software backup | Copy taken at each visit | Copy taken and restore verified yearly | As Standard, plus minor changes under your change control |
| Operator refresher training | - | Once a year | Twice a year |
| OEE and loss review | - | Yearly | Quarterly |
| Typical fit | Single machine, strong in-house maintenance | Production-critical machines | Validated or high-utilisation lines |
Be honest about what you need. A plant with an experienced maintenance team and one simple machine gets good value from Basic. A three-shift pharma line, where a stop also means deviation paperwork, is where Comprehensive earns its price.
A preventive maintenance schedule for a typical packaging machine
Every machine we deliver comes with its own PM schedule. The structure below is typical for a cartoner, filler, vial loader or case packer; the specific points and lubricants come from the machine manual.
| Frequency | Tasks | Who |
|---|---|---|
| Daily / every shift | Clean product dust and debris; check air pressure at the FRL; inspect suction cups, grippers and seal jaws; test emergency stops and guard switches; check reject bin and reject confirmation | Operator |
| Weekly | Check belt and chain tension; lubricate as per the chart; clean sensor lenses and reflectors; challenge vision or metal detector with test samples; drain the air filter bowl | Operator / technician |
| Monthly | Check gearbox oil levels; inspect cam followers, bearings and bushes for noise and play; listen for air leaks; tighten fasteners on moving assemblies; back up PLC and HMI if anything changed | Maintenance technician |
| Six-monthly | Replace FRL filter elements; inspect drag chains and servo cables; clean panel fan filters; check terminal tightness and earth continuity; check heater and thermocouple condition | Maintenance / MEF visit |
| Annual | Change gearbox oil as the maker specifies; replace the wear-part kit; calibrate load cells, temperature controllers and gauges; verify safety functions (light-curtain response, door interlocks, stop times); full software backup and version check | MEF visit with your maintenance team |
A laminated daily checklist on the machine, signed each shift, does more than a perfect schedule in a binder. Pharma plants usually fold it into the equipment logbook.
How remote support works
Many faults can be diagnosed in minutes if an engineer can see the PLC and drive diagnostics. Remote support makes that possible without anyone travelling - provided it is set up so that your IT and QA teams are comfortable with it.
- Industrial VPN router in the machine panel. It connects only the machine network, never your plant network, and makes an encrypted, outbound-only connection, so no inbound firewall ports need opening.
- Your IT approves the setup at commissioning: which network port, which remote-access service, which of our engineers have accounts.
- You switch it on. A key switch or HMI button enables the connection for a session; when it is off, nobody can connect.
- Named accounts and logs. Each of our engineers uses a personal account; the router logs who connected, when and for how long.
- Operator on the line. A phone or video call runs alongside, because an engineer seeing the PLC still needs someone who can see the machine.
Two design rules matter more than the router brand. First, remote access must never bypass a safety function: guards, e-stops and the safety PLC work exactly as they do locally, and a remote engineer cannot start motion without someone at the machine. Second, the router firmware and passwords are maintained like any other network device. Protection of control systems against corruption is also becoming a legal requirement for machines sold into Europe, as explained in our guide to the EU Machinery Regulation.
Remote access on validated pharma machines
On a machine that holds GMP records, remote access is a GMP-relevant activity. It does not need to be avoided, but it must meet the same rules as local access. 21 CFR Part 11 requires access to be limited to authorised individuals, and EU GMP Annex 11 asks for access control, change management and a risk-based audit trail of GMP-relevant changes.
- Remote engineers log into the HMI or SCADA with their own named user accounts and role, never a shared service login.
- Any change to a recipe, parameter or program is recorded in the machine's audit trail with the engineer's ID and reason.
- Program changes happen only under your change control, with QA aware before and a test record after.
- The router's connection log is kept as supporting evidence of who accessed the system and when.
- Remote access is covered in your risk assessment and in the system's validation documents, as described in our guide to GAMP 5 and computerised system validation.
What can and cannot be fixed remotely
| Usually fixed remotely | Needs hands on the machine |
|---|---|
| Reading alarm history and diagnosing the root cause | Worn or broken mechanical parts |
| Checking inputs and outputs, drive faults and encoder signals | Timing, alignment and belt tension adjustments |
| Adjusting parameters and recipes (with your approval) | Air leaks, damaged tubing and failed valves |
| Guiding an operator through a reset or format change by video | Replacing sensors, cables and drives |
| Restoring a software backup to a replaced controller | Re-verifying safety functions after hardware changes |
| Reviewing OEE, stop counts and reject data | Anything involving guards or live electrical work |
Even when a part must be replaced on site, remote diagnosis means the right part arrives with the engineer on the first visit.
Before you call for support
- Machine serial number and the exact alarm text or number from the HMI.
- What the machine was doing when it stopped, and whether anything was changed recently - format, material, settings.
- A short phone video of the fault, if it is mechanical or intermittent.
- Whether the machine can be run safely in manual mode while we diagnose.
Refresher training and OEE reviews
Machines rarely forget their settings; people change shifts and jobs. A year after commissioning, many of the operators we trained have moved on, and small workarounds have crept in. A half-day refresher at the machine - format change, cleaning, common alarms, what not to adjust - recovers more output than most spare parts.
The OEE review does the same for management. We look at availability, performance and quality losses from the machine counters, rank the top five stop reasons and agree fixes, whether that is a sensor bracket, a training point or a packaging-material issue. The method is explained in our guide to packaging line OEE.
Frequently asked questions
What does an AMC for a packaging machine include?
How often should a packaging machine be serviced?
Is remote access to a PLC safe?
Can remote support be used on a validated pharma machine?
What is the difference between AMC and CMC?
References
- 21 CFR Part 11 - Electronic Records; Electronic Signatures (eCFR)
- EU GMP Annex 11: Computerised Systems
- FDA guidance: Data Integrity and Compliance With Drug CGMP - Questions and Answers (2018)
Regulatory text changes. Always check the current version of a regulation before relying on it; this article reflects our reading as of 29 Sep 2026 and is not legal advice.