Buying Guides & Comparisons

Vial Blister Tray Packing: Manual, Mechanical or Robotic Loading

Between the vial labeller and the cartoner, most injectable lines still have a table of people putting vials into plastic trays. This guide explains the tray, the three ways to load it and how to size the step so it stops being the bottleneck.

By MEF Automation Engineering TeamUpdated 9 min read
In short
  • The blister tray is designed around the vial drawing, not the fill volume - a 10 ml tubular vial and a 10 ml moulded vial need different pockets.
  • Manual loading suits short batches; a mechanical loader is fast for one format; a robot pays back when one line packs several vial sizes and tray patterns.
  • Size the loader from the labeller speed and the tray pattern, then add headroom so it can catch up after short stops.
  • Every tray should be checked pocket by pocket before the cartoner, and the reject function challenged during OQ.
  • Put vial drawings, tray drawings, patterns, speeds and reconciliation counts in the URS before asking for quotations.
On this page
  1. What the blister tray does on an injectable line
  2. Vial formats and why the drawing matters
  3. Designing the blister tray
  4. Manual, mechanical or robotic loading
  5. Sizing the tray loader to the line
  6. GMP points: line clearance, counts and rejects
  7. What to put in the URS
  8. Frequently asked questions
  9. References

What the blister tray does on an injectable line

A vial blister tray is a thin thermoformed plastic insert with one pocket per vial. It sits inside the carton and does three jobs: it stops glass vials touching each other in transit, it holds them upright and in a fixed pattern so the carton looks right when opened, and it gives the pharmacist or nurse an easy way to take one vial at a time. Trays are usually open; some products use a tray sealed with a paper or foil lid, which is a true blister pack.

On the line, tray loading sits after the vial labeller (and, where fitted, after code reading or visual inspection) and before the cartoner:

  1. Filled, stoppered and crimped vials leave the capping machine or the visual inspection area.
  2. The labeller applies the label with batch, expiry and any 2D code.
  3. Vials are placed into the blister tray - by hand, by a mechanical loader or by a robot.
  4. The cartoner inserts one or more trays and a leaflet into each carton and closes it.
  5. Carton codes are printed and verified, cartons go to the case packer and then the pallet.

Because it is the only step on many lines that is still manual, tray loading is where counts drift, pockets are left empty and vials are knocked over. It is also where one operator's pace sets the output of two automatic machines.

Vial formats and why the drawing matters

Glass injection vials come in two families. Tubular vials are formed from glass tube and are covered by ISO 8362-1; their formats are named by an R number such as 2R, 6R or 10R. Moulded vials are blown in a mould, have thicker walls and wider tolerances, and are covered by ISO 8362-4. The nominal volume is the same in both families, but the dimensions are not.

FormatBody diameter (approx.)What it means for the tray
2R and 4R tubular16 mmSame diameter, different height - one pocket pattern, different pocket depth or head height
6R and 8R tubular22 mmSame diameter pair; common for 5 ml fills and lyophilised products
10R and 15R tubular24 mmSame diameter pair
20R to 30R tubular30 mmHeavier vials - pick head and placing speed must allow for mass
10 ml mouldedabout 25 mmWider than a 10R tubular vial - needs its own tray and format parts

Values are approximate and for orientation only. Use the drawing and tolerances from your vial supplier: the pocket, the feed screw and the pick head are all designed from that drawing, and moulded vials in particular vary more from lot to lot.

Liquid and lyophilised vials

Lyophilised (freeze-dried) products often use larger vials with a small, light cake inside, so the vial is light for its size and tips more easily on conveyors and transfers. Liquid vials of the same size are heavier and steadier. A tray loader for both needs format parts and speed settings for each, not one compromise setting.

The top of the vial

After crimping, the top of the vial is an aluminium crimp with a plastic flip-off button. A flat, clean button is a good surface for a vacuum cup. Domed or textured buttons, or colour-coded buttons that must not be marked, are better handled by soft fingers gripping the vial body.

Designing the blister tray

The tray is often designed by the packaging material supplier and approved by the brand team for appearance. It should also be reviewed by whoever will load it, because small details decide whether a machine runs smoothly.

MaterialWhy it is chosenWatch for
PVCEasy to thermoform, clear, low cost, widely availableStatic and brittleness in cold, dry conditions; chlorine content where customers ask for PVC-free packs
PETClear, stiff, PVC-free, recyclable in many marketsNeeds tighter forming control; edges can be sharper
PPTough and chemically resistantUsually translucent rather than clear; more flexible, so trays can flex during denesting

Details that decide machinability

  • Pocket clearance. Enough clearance over the maximum vial diameter that vials drop in without hanging on the rim; not so much that they tilt or rattle. Agree the value with the tray supplier using the vial tolerance, not the nominal size.
  • Pocket depth. Deep enough to hold the vial upright in transit, shallow enough that the pick head can release it without its fingers touching the tray.
  • Stacking lugs. Trays that nest too tightly stick together in the magazine. Small lugs or ribs keep a gap between stacked trays so the denester can take one at a time.
  • Flatness and stiffness. A tray that bows will not sit flat on the indexing conveyor, and pocket positions move.
  • Pocket pitch. The pitch between pockets sets the pitch of the collating nest and pick head. Keep it the same across tray sizes where possible so format parts can be shared.
  • Tray-to-carton fit. The loaded tray must slide into the carton on the cartoner without catching. Test with filled trays, not empty ones.
Change the tray, change the machine

A new tray supplier or a tooling change can alter pocket dimensions by fractions of a millimetre - enough to cause hanging vials or denest failures. Treat tray changes as a change control item and run trial trays on the machine before release.

Manual, mechanical or robotic loading

There are three practical ways to get vials into trays. None is right for every plant.

Manual tableMechanical loaderRobotic pick and place
How it worksOperators take vials from an accumulation table and press them into traysVials are collated and dropped or pushed into pockets by cams, star wheels or a thermoform-fill machineA robot with a multi-pick head lifts a row of vials and places it into the tray
SpeedLimited by people; varies by shiftHigh and steady for the format it is built forHigh; depends on head size and pattern
Format changesInstantMechanical change parts; some formats need a different machineRecipe plus a small set of format parts
Count and pocket checkVisual, by the operatorSensors or vision, depending on the machineVision check of every tray, counts logged
Capital costLowestMediumHighest
Best forSmall batches, many SKUs, low volumesOne or two vial sizes at high volumeSeveral vial sizes and tray patterns on one line; plants replacing manual tables

Two points are often missed. First, a mechanical loader that forms its own trays from PVC roll (a thermoform-fill machine) removes the need to buy pre-formed trays, but ties the pack design to the forming tool. Second, a robot cell is the easiest to retrofit between an existing labeller and cartoner, because it only needs a single-lane vial infeed and a tray outfeed.

How MEF approaches it

We look at the vial and tray range first. If one vial and one tray make up most of the volume, we say so, and a dedicated loader may be the better buy. Where the line packs several formats, we engineer the robotic vial pick and place cell together with the horizontal cartoner that follows it.

Sizing the tray loader to the line

The tray loader must keep up with the machine before it and feed the machine after it, with headroom to recover after short stops.

Trays per minute = vials per minute ÷ pockets per tray

Worked example

  • Labeller output: 120 vials per minute.
  • Tray: 5 pockets. Carton: 2 trays (10 vials).
  • Trays per minute = 120 ÷ 5 = 24 trays/min. Cartons per minute = 24 ÷ 2 = 12 cartons/min.
  • Add 15 - 20% headroom so the loader can empty the infeed accumulation after a labeller or cartoner stop: design for about 140 vials/min.
  • With a 5-vial pick head, that is 28 pick cycles per minute - a comfortable rate for one robot on a 5-pocket tray.

The same arithmetic tells you what manual loading costs. If one operator sustains, say, 25 vials a minute over a shift (measure your own - it varies with vial size and fatigue), the 120 vials/min labeller needs about five people on the tray table every shift, plus relief for breaks. That figure, multiplied by shifts and years, is the number to compare against the machine.

For how speed, stops and rejects combine into line output, see our guide to packaging line OEE.

GMP points: line clearance, counts and rejects

Tray loading handles labelled product, so it falls squarely inside the packaging batch record.

  • Line clearance. The machine should have no hidden ledges or pockets where a vial or tray from the previous batch can stay. Open frames and clear guarding make the check quick.
  • Reconciliation. Counts of vials received, vials placed, trays completed and rejects should close against the labeller and cartoner counts for the batch.
  • Reject function. Trays with an empty pocket, a tilted vial or a missing seal must be rejected automatically. Challenge this with prepared test trays at start-up and during OQ.
  • Glass breakage. Have a written procedure for what happens when a vial breaks in the machine - stop, clear, clean, inspect neighbouring vials and record it.
  • Access and data. User levels, recipe protection and, where needed, audit trail and electronic records. Our 21 CFR Part 11 guide explains what applies to packaging machines.

Qualification follows the usual path: design review against your URS, FAT with your vials and trays, then IQ and OQ on site. Our guide to IQ, OQ and PQ lists the tests a tray loader typically goes through.

What to put in the URS

Quotations for tray loaders vary widely because suppliers are guessing at the same missing information. A short URS removes the guesswork. Our URS guide covers the full structure; for a vial tray loader, make sure it states:

  • Every vial format to be handled, with drawings, tolerances and whether liquid or lyophilised.
  • Seal type and colours, and whether the seal may be touched by a vacuum cup.
  • Tray drawings, material and supplier; pocket patterns; trays per carton.
  • Upstream and downstream machines, their speeds and how they signal stops.
  • Target output in vials per minute and the headroom required.
  • Checks required on each tray (presence, upright, seal, seal colour, label) and reject handling.
  • Counts and reports for the batch record; data integrity requirements.
  • Construction materials, cleaning method and area classification.
  • Changeover time target and who will do it.
  • Documentation: DQ, FAT, SAT, IQ, OQ protocols, drawings and spares list.

Frequently asked questions

What is a vial blister tray?
A vial blister tray is a thin thermoformed plastic insert, usually PVC or PET, with one pocket per vial. It holds vials upright and apart inside the carton so they do not knock together in transit, and presents them neatly when the carton is opened. Common patterns hold 1, 2, 5 or 10 vials. A tray sealed with a lid is a blister pack.
How are vials loaded into blister trays?
Vials are loaded by hand at a tray table, by a mechanical loader that collates and drops vials into pockets, or by a robot with a multi-pick head. Manual loading suits small batches; mechanical loaders are fast for a single format; robots suit lines that pack several vial sizes and tray patterns, and include a vision check of every tray.
Can one tray fit both tubular and moulded vials of the same volume?
Usually not. Tubular vials (ISO 8362-1) and moulded vials (ISO 8362-4) of the same nominal volume have different diameters and heights, and moulded vials have wider tolerances. The tray pocket, feed screw and pick head should be designed from the drawing of the vial actually used, and each vial type normally needs its own tray.
How fast should a vial tray loader be?
It should match the labeller output plus 15 - 20% headroom so it can catch up after short stops. For example, a 120 vials per minute labeller feeding 5-pocket trays needs 24 trays per minute; design the loader for about 140 vials per minute. The cartoner must then handle the resulting trays or cartons per minute.
Which is better for vial trays, PVC or PET?
PVC is easy to form, clear and low cost, and is the most common. PET is also clear and stiffer, and is chosen where customers want PVC-free packaging. Both work on tray loaders if pocket clearance, stacking lugs and flatness are designed correctly. Static in dry conditions affects both and should be considered at the tray magazine.

References

  1. ISO 8362-1:2018 - Injection vials made of glass tubing (catalogue entry)
  2. Measured diameters of 2, 4, 6, 8 and 10 ml tubular vials (PMC table)
  3. Standard dimensions of moulded glass vials (PMC review table)

Regulatory text changes. Always check the current version of a regulation before relying on it; this article reflects our reading as of 29 Sep 2026 and is not legal advice.

Planning to automate your vial tray table?

Send us your vial and tray drawings, the patterns you pack and your labeller and cartoner speeds. We will tell you which loading method fits and what it would take.